We develop architectural and engineering projects with more than 10 years of experience. We use the most advanced digital BIM tools to provide technological solutions according to each need.

WE MAKE

Our job is to expertly combine all of these disciplines and apply our expertise strategically to provide precise consultation solutions for every project.

REALITY

Our projects stand out thanks to their versatility, Quality and consistency of the information, which provide a key factor in workflows, results, and deliverables.

WORK

Clients who have worked with us: Aguas Andinas, CMG Ingeniería, Delporte Ingenieros, Escudero Arquitectos, JEJ Ingeniería, ARBEC ingenieros, Inmobiliaria Alterra, Inmobiliaria Metra.

about us

MARÍA A. SÁNCHEZ

Architect, Universidad de la República, Uruguay

BIM Manager with 20 years of experience in implementation, instruction, design, and developments of projects using BIM technologies. 

WOLFGANG SCHOENBECK

Architect, Universidad del Istmo de Guatemala, 

Founded Alinea BIM in 2017

Master’s degree in Architecture, Pontificia Universidad Católica de Chile

 

Example of a BIM model for fire prevention project. 

A key aspect of BIM coordination meetings is the need to clarify details proposed by the specialists in each of their projects. In this example, we review the level of detail encompassed in our models for a better understanding of the proposed designs.

Example of a BIM sanitary model 

It was necessary to visualize the conditions of drinking water meters by apartment to evaluate the feasibility of the proposed space for the installation. The model allowed us to establish the design and location of the markers correctly through BIM coordination. 

Audits

BIM coordination

Implementation

Scan to BIM Point Cloud

Simulations

Featured projects

MANQUEHUE NORTE BUILDING

Office project totaling 23, 213m², which was approached with critical modeling under BIM methodology for the following specialities: structure, excavation, topography, waste, hVAC, security, fire, electricity, and elevators, from the initial pre-project stage until apt for construction.

BIM coordination was executed for all specialities in a common data range, allowing all parties to access the work files in real time. The generation of coordination and progress reports for the client was also carried out.

Chamisero Water Treatment Plant

This project was a drinking water treatment plant totaling 18,000 m². This was a project that required the validation of the data and consistency of the previously executed models prior to the construction phase.  

The audit of the BIM models in this project allowed us to verify the coherence of the model with its level of development in accordance with the established definitions in the BIM execution plan.

SAN EUGENIO BUILDING

Residential high-rise project totalling 23,008 m².  Validation of the speciality deliverables was carried out using critical modeling under BIM methodology for the following specialities: structure, (socalzado), weak currents, topography, waste, HVAC, security, fire, electricity, and elevators, from the initial pre-project stage until apt for construction. 

BIM coordination was executed for all specialities in a common data range, allowing all parties to access the work files in real time.  The generation of coordination and progress reports for the client was a key factor in this process.

contact us

Phone

+56 9 9007 2290

eMail

info@alineabim.cl